December 2023/January 2024
In this project, we were asked to redecorate the entire rugby sports centre for the first time in 25 years and tile the bar section.
Painting involved filling in gaps and holes in the walls and ceilings after the replacement of the lighting units.
Once the appropriate work was done the ceilings have been painted with the Vinyl Matt emulsion and the walls with durable emulsion.
The doors, which have been previously stained, sanded down with an appropriate device to obtain the right surface for primer, and then covered with 2 coats of oil paint to get the highest protection against mechanical damage.
To tile the bar area, we have used ceramic tiles 100×300 mm with 2mm spaces of dark ground.
Entrance Area
Tiling the Bar Area – Alignment
Before
After
The Main Area
The project was completed on time and on budget.
Other projects involving Decorating and Tiling
Polebrook, Northamptonshire 2020.
Polebrook, Northamptonshire 2020. The specification for this project in Polebrook was to repair and restore the following:- 58 exterior windows, 62 oak lintels, 4 oak doors, An Oak Conservatory 2 garage doors. To enable us to work on the highest windows a...
Fen Drayton swimming pool
Fen Drayton, Cambridgeshire 2021. For this project, our brief was to tile and decorate the newly constructed swimming pool.We used several types of tiles which include porcelain, mosaic and ceramic. In addition natural stone was used in the pool and changing rooms. ...